The project is a concrete tilt-wall construction project with just over 50,000 square feet. CP’s engineers designed a special foundation for a motion system which tests equipment by simulating certain types of conditions through vibration and movement. The tenant required special consideration for large flight simulators to be installed. The building design accounted for the simulator’s dynamics and clearances. Foundations were developed to anchor the simulators while being isolated from the building. Additionally, fully removeable concrete panels were used on one side of the building to allow for future expansion plans.